Category: Team
Sampling the second pot experiment, January 2023
The slope lysimeters: filling, sampling water and vegetation
Field work with rainfall simulator and vegetation mapping at two scales 2022
Happy work, November 2022
The second pot experiment after one month
Inspection of the access roads to field sites, 29th March 2022
